Our Northwest acreage has been the centre of much of our activity to date. The productive capacity of the coals has been established by our pilot production site at Doe Green and the ongoing energy export activities at this site. In addition to continuing to assess and model the subsurface we have now obtained planning permission for five production sites in the area ranging from Ellesmere Port in the west in PEDL 190 to the Trafford Centre in the east within PEDL 193. A significant proportion of this acreage is now also considered to have shale that has a very high potential to be hydrocarbon bearing.

Parkside – PEDL 193 This area is located in South Lancashire, to the southeast of the old Parkside Colliery area of the South Lancashire coalfields and northeast of Warrington. Geologically, the licence is on the southern margin of the Rossendale anticline and on the western margin of the Pennine Axis, and targets the unworked CBM potential of the southern extension of the South Lancashire coalfield which is proven, by prior National Coal Board (“NCB”) boreholes, to extend for at least 5 km to the south east. The oldest rocks present in the area belong to the upper part of the Millstone Grit Series of Upper Carboniferous age and are followed conformably by the Lower and Middle coal measures. These geologic strata consist of alternating shales, sandstones and coal seams. The northern and western area of the licence includes part of the underground workings of the abandoned South Lancashire Coalfield. The workings demonstrate the presence of multiple thick (>3 feet) coal seams within the Upper Carboniferous, Westphalian and Pennine coal measures. Exploration work carried out by the former NCB confirms the regional structure of the Coal Measures as gently dipping to the south (at depths up to and exceeding 4,000 feet) and being broken up by a series of normal faults.

It is IGas Energy’s intention to confirm the CBM production potential of the licence by drilling a well into the application area, contingent upon achieving the required planning permission; which well would satisfy the licence commitment which is due by July 2014. Identification of potential well sites is ongoing.

Licence Number

PEDL 193

Aerial Extent

296 km2

End of Licence Terms

July 2014

Licence Terms

Initial Term

Net Risked GIIP Range

Low - 826 Bcf, Mid - 1,321 Bcf, High - 4,126 Bcf

Wells Drilled

None to date